Projects co-financed by European Union Founds

            
             EXPANSION OF THE TECHNOLOGICAL PARK IN FINOMAR Sp. z o.o.

                     The project implementation includes purchase of the bending machine, CNC milling machine for templates including an extraction system
                     for dust and chips.
                     The implementation of new solutions allows for bending high quality profiles keeping proper tolerances and for of making complex
                     templates in CNC technique.
                     The aim of the project is to implement innovative production solutions for bending sophisticated profiles.
                     It also allows to offer new services for the shipbuilding sector.

                PROJECT VALUE AND CONTRIBUTION OF EUROPEAN FUNDS:   

                     The total value of the project is PLN 680,190 of which  PLN 248,850 is co-financed from European Union Funds.
                     Project implementation date: December 31, 2021

             

             CONSTRUCTION OF THE MULTIFUNCTIONAL SUBMERSIBLE PONTOON
                     (floating pontoon slipway) for the construction, launching and transporting of ship hulls and their elements
                     and other large-size structures,
with application of innovative technical solutions and method of operation
                     patented by Finomar Sp. z o.o.

              PROJECT OBJECTIVES, PLANNED EFFECTS:                  

                    The project consists in technology of production and delivery of the large-size floating structures (ship hulls) and objects for the offshore sector,
                    using Finomar invention, i.e. a floating launching pontoon (PPP): a solution for lowering changing the high position of large-size structures,.
                    The project innovation concerns mainly the Finomar patented method of shifting objects from the quay onto the floating launching pontoon
                    and vice versa, with possibility of tilting the whole set for gradual placing (launching) and operation on relatively shallow waters.
                    This arrangement allows for moving and placing objects operated in water environment from the wharf onto the surface or on the bottom
                    of the water basin.
                    The aim of the project is to implement the process innovation in Finomar that allows for displacement (on the land-water line),
                    launching, or taking large-size objects of considerable weight (up to 550 tons) from water in the production process, as well as to provide such
                    services for other customers.
                    Moreover, it will allow to extend the Finomar’s offer with new proposals, i.e. exceeding  weight of 420 tons and length of 30 meters
                    that can be launched using the floating pontoon slipway (PPP) as well as transported by water to its destination.

               Project value and contribution from European Funds:
                   The total value of the project is PLN 4,374,600 of which PLN 1,800,000 is co-financed from European Union Funds.

               Project completion date
                   The project was implemented in 2020.

              
               SYSTEM
CONTROL FOR CHECKING MEASUREMENTS OF STEEL STRUCTURES DURING FABRICATION PROCESS
               IN ORDER TO REDUCE  CORRECTION WORKS.
              
            Project goal
             

                   The subject of the study was to design the measurement control system.
                   The developed system allows to maintain optimal work parameters control and measurement in terms of required dimensional quality
                   of structural elements in the process of fabrication of the steel structures at Finomar.
                   The system is directed toward quick and most accurate determination of the geometrical quality of prefabricated structures.
                   Gained information forms the basis for the development of selection procedures and optimization of production processes what in turn leads
                   to the minimization and even elimination of a number of costly technological processes.
                   The developed system provides for the optimal selection of measurement techniques and methods depending on characteristics of a given
                   construction process.
                   The system takes into account the current abilities of Finomar and at the same time it indicates the optimal directions for the development
                   of measurement equipment.

             Planned effects
                   It was estimated that the developed system will be used for gaining, cataloging and analysis of geometric data for continuous optimization
                  of the production processes aimed at reducing the labor consumption of correction works.

             Project value and contribution from European Funds:
                  The total value of the project is PLN 36,900.00 of which PLN 24,500.00 was co-financed from European Union Funds.

             Contractor and project completion date
                  The main contractor of the project was the Faculty of Maritime Technology and Transport of the West Pomeranian University of Technology.
                  The project was implemented in 2017.